330kv Transmission Line
Phase 1 - Constructing Transmission Lines with Sub-stations
Status: Ongoing
Value: US$245.2m
Client: NDPHC (Niger Delta Power Holding Company) for the Federal Ministry of Power and Steel
Location: Various States in Niger Delta region
As part of the National Integrated Power Project, Rockson Engineering is carrying out the engineering, procurement and construction of 330kV and 132kV transmission lines together with 330kV/132 and 132/33kV sub-stations (four in total).
- 60km Owerri to Alaoji
- 75 km Owerri to Onitsha
- 60 km Omoku to Egbema to Owerri
- Including four sub-stations