![]() |
|||||||
![]() |
|||||||
|
Rockson Engineering Construction Projects330kv Transmission LinePhase 1 - Constructing Transmission Lines with Sub-stationsStatus: Ongoing As part of the National Integrated Power Project, Rockson Engineering is carrying out the engineering, procurement and construction of 330kV and 132kV transmission lines together with 330kV/132 and 132/33kV sub-stations (four in total).
|
||||||
|
|||||||