• alaoji_cons_june07_001_960240
  • alaoji_cons_may07_008_960240
  • omoku_aerial_960240
  • omoku_pylon_960240
  • omoku_rebar_960240
Rockson Engineering Construction Projects

Eleme Power Station

Phase 2 - Increase capacity from 20MW to 75MW

Status: Ongoing
Client: Rivers State Government
Location: Rivers State (Niger-Delta region)

Engineering, procurement and construction of an extension to Eleme gas turbine power station to increase the capacity and efficiency from 20MW to 75MW by replacing the existing GE LM2500 turbine with 3 x 25MW Nuovo Pignone gas turbines.

Project includes:

  • Civil works, foundations and piling
  • Switchgear, 132kV switchyard, cables, synchronising panels for 3 gas turbines
  • Black start generator
  • Connection to State 132kV grid
  • Supply and installation of 3 x 25MW Frame 5 gas turbines (including trade-in of old unit)
  • Gas skid, piping and gas heaters
  • Canopy for gas turbines and crane