Omoku Power Station
Phase 2 - Constructing a 252MW Gas Turbine Power Station
Status: Ongoing - Recent images
Value: US$240.9m
Client: NDPHC (Niger Delta Power Holding Company) for the Federal Ministry of Power and Steel
Location: Rivers State (Niger-Delta region)
As part of the National Integrated Power Project, Rockson Engineering is carrying out the engineering, procurement and construction of a 252MW gas turbine power station with 2 x 126MW GE 9EA gas turbines. This power station is completely "stand alone" and separate from the existing Rivers State Government 150MW power plant.
The two stations will be inter-connected at the RVSG 132kV switchyard.